Gold Member Since 2007
Audited Supplier
Changzhou Jianlian Reinforcing Bar Conjunction Co., Ltd.

Rebar Coupler, Connector, Coupling manufacturer / supplier in China, offering Super Upset Forging Steel Bar Coupler, BS4449 Dextra Rolltec Thread Machine (16-40mm), Automatic Bar Mechanical Splice Forging Threading Machine and so on.

(/ )

Supplier Homepage Product CARES TA1-A/B Standard Coupler Super Upset Forging Steel Bar Coupler

Super Upset Forging Steel Bar Coupler

FOB Price: US $1 / Piece
Min. Order: 1,000 Pieces
Min. Order FOB Price
1,000 Pieces US $1/ Piece
Get Latest Price
Production Capacity: 20, 000PCS/Day
Transport Package: Carton
Payment Terms: L/C, D/P, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Connection: Mechanical Connection
  • Certificate: CE and ISO
  • Function: Link Two Rebars Dia. From12~40mm
  • Working Environment: No Limits
  • Price: The Most Competitive
  • Port: Shanghai
  • Specification: GB
  • HS Code: 73079200
  • Material: Carbon Steel
  • Operation: Easily Handy
  • Tensile Strength: Strong Strength
  • Quality: High
  • Service: Excellent
  • Trademark: JBCZ
  • Origin: China
Product Description
 Specifications:
Steel bar diameterOuter diameter of coupler (MM)Length of coupler (MM)Size of thread (MM)
122030M14*2.0
142234M16*2.0
162640M20*2.5
182944M22*2.5
203248M24*3.0
223652M27*3.0
254060M30*3.5
2844.566M33*3.5
325072M36*4.0
365680M39*4.0
406290M45*4.0

Description:

JBCZ super upset forging coupler is used in applications where the continuation bar can be rotated freely and is comprised of an internally threaded coupler with a single right hand thread. The ends of the bars are upset and threaded for half the length of the coupler.

Applications:
Bridge ProjectHangzhou Bay Crossing Sea Bridge, Jiangyin Yangzi River Bridge, Jiangsu Runyang Bridge
Commercial Building ProjectBurj Khalifa Tower, Oriental Pearl tower, Saraya Tower, Jinmao Tower
Public ProjectBeijing Capital Airport, Qinshan Nuclear Power Plant, Gazi-Barotha Hydropower Station In Pakistan, North Jeddah Water Pump Station, Dubai Metro, Suzhou Gymnasium

Competitive Advantage:

1.Quick and easy installation
2.Well meet seismic requirement
3.Meet slip test requirement
4.Manufactured under strict quality assurance plan ISO 9001 and Technical Approval TAC-133
Send your message to this supplier
Avatar
Ms. Sunny
*From:
To: Ms. Sunny
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category